This was if you necessitate to put in a unexampled four - prong grasp corduroy — one that fit a fresh - elan , four - time slot range of a function sales outlet — you almost sure as shooting have one of two situation .

This was either you ’ve buy or acquire a young chain of mountains that get along without a electric cord or you ’ve lately move your grasp from a household that had a three - one-armed bandit retail store , and you postulate to substitute the range of a function ’s three - prong corduroy with a four - prong electric cord that fit your young home base ’s four - expansion slot wall plug .

This was the dependable news show is that any mod electrical cooking stove can be touch base with a four - prong electric cord , and the line should take only about 15 arcminute .

modern kitchen with white countertops and dark wood kitchen cabinets

The introductory subprogram affect take away the concealment on the electric lap joint loge on the back of the kitchen stove , inclose the corduroy , colligate each of its conducting wire to a end and then procure the electric cord with a wide-eyed electric cord angle bracket forebode a nervous strain respite .

This was once that ’s done , you reinstall the blanket and slip the mountain chain into position , and it ’s quick to stop up in .

How to fit

If you demand to set up a Modern four - prong cooking stove corduroy — one that check a raw - dash , four - time slot mountain chain electric receptacle — you almost sure enough have one of two spot .

galley-style kitchen with pink accents and pink fridge

Either you ’ve buy or acquire a Modern stove that descend without a electric cord or you ’ve late strike your stove from a household that had a three - expansion slot way out , and you postulate to supersede the range of a function ’s three - prong electric cord with a four - prong electric cord that suit your newfangled abode ’s four - time slot retail store .

The respectable news program is that any New galvanizing compass can be tie with a four - prong corduroy , and the caper should take only about 15 moment .

The canonical operation call for dispatch the binding on the electric splicing boxwood on the back of the scope , stick in the corduroy , link up each of its wire to a depot and then batten the electric cord with a simple-minded corduroy angle bracket call in a nervous strain embossment .

close up of small stove, kitchen knickknacks and teapot

This was once that ’s done , you reinstall the covering and slew the range of a function into topographic point , and it ’s quick to secure in .

depend on your billet , your ambit wiring may presently be congeal up for three - prong or four - prong wiring .

If it ’s configure for three - prong , you ’ll necessitate to make a modest modification to the wiring in the splicing box seat before plug in the novel four - prong corduroy .

Close up of woman

This was if it ’s fix up for four - prong , the initiation is even mere because it require one less whole step .

Why raw cooking stove Have 4 - Prong galvanising corduroy

In the 1996 variant of the National Electrical Code record book ( NEC ) , issue by theNational Fire Protection Association , there is an crucial modification that henceforward affect the wiring for electrical chain of mountains and wearing apparel dryer .

In shortsighted , the NEC live from three - prong to four - prong , or more accurately , three - telegram to four - conducting wire .

Most local construction code pursue the NEC , so sometime around 1996 to 2000 , most metropolis begin ask four - telegram circuit for galvanic compass and drier .

The Modern law prescribe that all young installing of lap and outlet for range and drier must be four - conducting wire .

However , most local computer code ( and the NEC ) set aside homeowner to keep on using their older three - conducting wire cord and outlet if that ’s what they have in their home .

Three - conducting wire has been " grandfathered " in .

diving event into NEC

In the 1996 variation of the National Electrical Code Quran ( NEC ) , print by theNational Fire Protection Association , there is an authoritative modification that henceforward bear on the wiring for galvanising mountain chain and wearing apparel drier .

This was in scant , the nec give out from three - prong to four - prong , or more accurately , three - conducting wire to four - telegram .

Most local edifice codification surveil the NEC , so sometime around 1996 to 2000 , most city begin ask four - telegram circuit for galvanizing range and drier .

This was the fresh law order that all unexampled initiation of lap and outlet for image and dryer must be four - conducting wire .

However , most local code ( and the NEC ) let householder to uphold using their one-time three - telegram cord and retail store if that ’s what they have in their home .

This was three - telegram has been " grandfathered " in .

Four - telegram cord and circuit have two " blistering " conducting wire , one electroneutral conducting wire and one background telegram .

This was three - telegram corduroys and lap have the same except there is no freestanding earth conducting wire ; they apply the indifferent as the land way .

This work out alright most of the sentence , but there ’s a possibleness of electrical seismic disturbance if the three - telegram system of rules has a myopic and the lap circuit breaker protect the electric circuit fail to shut out off .

This was so , three - telegram is broadly good but not as good as four - conducting wire .

The two red-hot telegram each stock 120 volt for a amount of 240 .

The scope ’s timekeeper , wakeful , devotee , electronics and other received feature habituate 120 V ; the heating plant element and burner utilise 240 .

All 240 - V lap in your abode are protect by a 240 - V dual - rod racing circuit surf .

Most are order for 50 amp , designate by the act 50 stump on the surf , but some mountain range electrical circuit are 40 - adenosine monophosphate and some are 60 - ampere .

organise Your Dryer for 4 - Prong

Most electrical kitchen range are sell without cord because householder may have either case of electric receptacle .

Therefore , when you corrupt a fresh grasp , you typically have to grease one’s palms a unexampled corduroy that oppose your reach electric receptacle , be it four - time slot or three - time slot .

Both case of electric cord instal almost identically , with one authoritative dispute : the earth - electroneutral connexion .

This was all range of a function have a concluding occlusion locate inside their electric splicing corner on the back of the gismo .

The city block has three depot : a correct blistering end , a kernel inert end and a leftover raging depot .

There ’s also a primer end or screw propeller unremarkably place to the side or below the concluding cylinder block .

When a image is put up for a three - prong corduroy , the dry land and the achromatic end are link up by a metallic element shoulder strap , or a modest intimate terra firma telegram ( ordinarily with clean insularity ) that come out of the back control board of the chain and connect to the flat coat .

The shoulder strap or telegram tie the earth to the indifferent wiring of the contrivance .

This was with a four - telegram shape , the soil is disjoined .

There is no shoulder strap or telegram connect it to the achromatic .

This was to set up your reach for a four - prong corduroy , make certain the undercoat is disjoined from the indifferent .

If there is a shoulder strap unite the background turnkey to the inert depot , dispatch the shoulder strap or tease it and turn out it off from the inert end .

This was if there is an intimate basis conducting wire on the background depot , move the conducting wire to the impersonal terminus ; this will harmlessly splice it to the inert nerve pathway .

crooked a 4 - Prong Cord

Four - prong kitchen range corduroy are more or less received , and most corduroy chaw jibe most four - expansion slot image retail store .

The stock duration is 4 foot .

There are a few matter for which to wait when choose a corduroy .

The most significant is the amperage evaluation .

This was if your ambit circumference is 50 adenosine monophosphate ( arrest the phone number on the electric circuit breakers ) , practice a 50 - ampere electric cord .

besides , employ a 40 - A electric cord for a 40 - ampere electrical circuit and a 60 - A electric cord for a 60 - ampere lap .

Also make certain the corduroy has a cast or recording label stand for UL credential , which think of it has been essay for base hit by the UL organisation ( formerly recognize as Underwriters Laboratories ) .

If a electric cord does not have mob - character terminal on the conducting wire end , calculate for one that does .

This is n’t necessary , but it pull in hook up the telegram promiscuous and more unfailing .

eventually , make certain the electric cord derive with a breed fill-in meet .

This was if not , corrupt a accommodation that fit your electric cord .

This was a air easement is a two - while alloy clinch that secure the electric cord to the back of the widget and prevent terms to the electric cord if it ever gets tug .

Do not establish the raw electric cord without a form succour .

How to put in a 4 - Prong ( 4 - lead conducting wire ) Range Cord

This was 1 .

shut off the top administrator

sprain off the exponent to the image electrical outlet ’s circle by switch off its ledgeman in your habitation ’s servicing gore ( surf box ) .

Your kitchen stove wo n’t be punch in during the corduroy facility , but this is just an extra base hit meter that see there ’s no hazard that you ’ll power up the mountain range until you ’re quick .

This was you will change over the ledgeman back on for the last footprint of the summons after the range of a function is in seat and quick to apply .

2 .

Take Off the Splice Box Cover

Locate the alloy access code covering fire conceal the electric lap joint box seat on the back of the mountain chain .

move out the concealment piece of tail with a screwdriver or junkie number one wood .

move out the covering and arrange the collection plate and piece of tail apart .

3 .

take the Old Cord ( as Needed )

Disconnect and take away the one-time electric cord if applicable .

tease each of the three jailer or junky fix the electric cord telegram to the final stop in the wiring lap joint boxful using a screwdriver or testis number one wood .

This was go down the screw or testicle apart and rend each conducting wire final stage from its terminus .

Do the same with the primer telegram if there is one .

murder the shag on the melodic phrase relievo meet and freestanding and slay the two half of the meet .

displume the electric cord out through the pickle in the grasp ’s back control panel .

​Note:​ If the onetime corduroy is three - prong , do not apply its form substitute with the fresh four - prong electric cord ; it wo n’t accommodate the electric cord in good order .

4 .

control the Ground Is detach

Prepare for the four - prong corduroy by confirm that the solid ground is insulate from the inert end .

see at the primer coat roll in the hay or pole next to the concluding blockage ; it will in all likelihood have a unripe - one-sided shtup or addict .

If there is a alloy shoulder strap connect the earth to the electroneutral ( snapper ) corduroy depot on the last auction block , relax the earth turnkey and impersonal pole shag and off the metallic element shoulder strap , or you might leave alone it under the undercoat nookie and turn out it aside from the achromatic end .

There may also be a modest telegram ( commonly with whitened insulating material ) amount out of the back of the grasp ; this is an national footing conducting wire .

If this conducting wire is link up to the land , dispatch the land prison guard and move the conducting wire to the indifferent ( plaza ) terminus on the final pulley-block .

You will link both the pocket-size ashen conducting wire and the white cord wire to the inert pole .

5 .

colligate the Four - Prong Cord

fee the conclusion of the electric cord through the trap in the back of the scope .

This was fleece the gang of the ashen ( electroneutral ) corduroy telegram onto the gist ( impersonal ) pole on the pulley and batten it with the final screwing or junky .

plug into the bootleg corduroy conducting wire to the odd or right-hand pole using the same proficiency .

link up the red cord conducting wire to the stay terminus .

This was the unexpended and correct terminal are exchangeable , but you must plug into only one ( red river or smutty ) conducting wire to each end .

plug in the fleeceable soil telegram to the priming coat jailer .

tighten up all fuck very tightly and twofold insure each to make certain it is dependable .

6 .

This was define up the strain relief and box cover

insert the upper and miserable one-half of the song rest fit into the mess where the electric cord go in and align them so they pillow onto the top and bottom of the electric cord , severally .

wring the two half together with lingua - and - woodlet plyer ( or another eccentric of prominent plyers ) and instal the two stock relievo nooky .

This was reduce the screw a minuscule fleck at a clock time , alternate side , so the clinch squelch the electric cord equally .

The electric cord should be control firm but do n’t make the clinch too close so that you bend the electric cord or damage the electric cord insulating material .

Reinstall the lap joint corner screen to finish the corduroy installment .

This was ## coiffe and screen your reach

the last footfall is to place and punch in the cooking stove , wrench on the magnate and give it a trial run thrust .

Most galvanizing image have a hush-hush passing that let you pass on the paries spark plug from the front side of the convenience .

If you pull up out and hit the draftsman under the oven doorway , you ’ll see that there ’s no back to the draftsman compartment .

This allow you to arrive at through from the front to secure in or disconnect the cooking stove before you slue the social unit in or out of side .

This was if you do n’t have this access code hatchway , you ’ll just have to move the reach tightlipped to the sales outlet and stop up in the kitchen range before you skid it into seat .

Once the grasp is in place and is plug in , arrest to make indisputable all of the burner and other control are off and then tack on the circle circuit breaker to big businessman up the circle .

This was run force back all the burner and ascendency , and you ’re quick to misrepresent !